• HỢP TÁC XÃ CHẾ BIẾN THỨC ĂN CHĂN NUÔI

      BÌNH MINH

    • Hotline: 0918 889 889
    • Email: tacnbinhminh@yahoo.com

    HỖ TRỢ KHÁCH HÀNG

  • Miền Nam
  • Miền Trung
  • Miền Bắc
    • Hotline: 0913 879225 - 0918263064

    Sunday, 02:03 - 03/01/2016

    The development – called Clair Ridge – will involve the construction and installation of two new, bridge-linked platforms, scheduled to be installed in 2015 with production expected to commence in 2016 One platform will be used for drilling and production, with the second for worker's accommodation. The topsides will be built by Hyundai Heavy Industries in Korea with the jackets being ...

    Sunday, 02:04 - 03/01/2016

    The development – called Clair Ridge – will involve the construction and installation of two new, bridge-linked platforms, scheduled to be installed in 2015 with production expected to commence in 2016 One platform will be used for drilling and production, with the second for worker's accommodation. The topsides will be built by Hyundai Heavy Industries in Korea with the jackets being ...

    TOP